
Southmore Bridge demolition will begin Friday, April 20th. Based on information from Drive288.com, the bridge will be closed for 12-18 months. Northbound and Southbound ramps to and from Southmore Blvd. will be open, unless construction requires closure.
Check Drive288.com for more information as construction begins.